PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Erecting Stone panels at the 4th floor East Elevation 2.jpg Installed piping at the 4th floor Facing West.jpg Installing duct work at the 4th floor Facing North.jpg Installing pipe hangers at the 2nd floor Facing West.jpg Interior metal framing at the 3rd floor Facing South-West.jpg Metal framing aroung the 2nd floor roof Facing West.jpg Storm piping installing for the high roof Facing North.jpg
Previous pageNext page Interior metal framing at the 3rd floor Facing South-West
Interior metal framing at the 3rd floor Facing South-West